The TKC Industrial Holding provides integrated technical and technological support of projects worldwide. Locations, where our experts have completed or are currently running projects with the help of our equipment, are specified below.

2013 Algeria
2013

Construction of the GR5 Gas Pipeline

Development of process maps and technical support of welding.

2010–2011 Amur Region
2010–2011

Construction of the Eastern Siberia-Pacific Ocean Oil Pipeline

Development of process maps and technical support of welding.

2013 Arkhangelsk Region
2013

Reconstruction of Interplant Pipelines for the KS-14 Compressor Station of the Prividinskoe Trunk Gas Pipeline System

Quality control of weld joints.

2011 год Arkhangelsk Region
2011 год

Construction of sixth line of the Ukhta – Torzhok Gas Pipeline

Full scope of works on a section 185 km in length; pipe diameter: 1420 mm; wall thickness: 21.6-32 mm.

2011–2014 Astrakhan Region
2011–2014

Servicing of the Caspian Pipeline Consortium Oil Pipeline

Maintenance and service of sections of the main pipeline.

2011–2015 Astrakhan Region
2011–2015

Expansion of Caspian Pipeline Consortium

Performing work on construction and logistical support and procurement for tank farms.

2013 Astrakhan Region
2013

Build out of Filanovskiy Oilfield

Quality control of weld joints.

2000 Azerbaijan – Russian Federation
2000

Construction of Baku – Tikhoretsk Oil Pipeline

Development of process maps and technical support of welding.

2012 Irkutsk Region
2012

The fourth phase of the construction of the Verkhnechonskoe Oil and Gas Condensate Field

Quality control of weld joints.

2006–2009 Irkutsk Region
2006–2009

Construction of the Eastern Siberia-Pacific Ocean Oil Pipeline

Development of process maps and technical support of welding.

2008–2010 Kaliningrad Region
2008–2010

Construction of second line of Minsk – Vilnius – Kaunas – Kaliningrad Gas Pipeline

Supply of CRC M-300 and Lincoln Electric welding equipment, development of process maps and technical support of welding.

2013–2014 Kazakhstan
2013–2014

Construction of the Beyneu – Bozoi – Shymkent Gas Pipeline

Development of process maps and technical support of welding.

2005 Kazakhstan
2005

Construction of the Atasu-Alashankou Oil Pipeline

Development of process maps and technical support of welding.

2014 Kazakhstan
2014

Construction of the West-East Gas Pipeline

Development of process maps and technical support of welding.

2013 Kazakhstan - Russian Federation
2013

Construction of Tengiz-Novorossiysk Oil Pipeline

Development of process maps and technical support of welding.

2013 Khabarovsk Territory
2013

Gasification of Khabarovsk Territory

Quality control of weld joints during the construction of gas pipelines.

2009 год Khabarovsk Territory
2009 год

Construction of the Sakhalin – Khabarovsk – Vladivostok Gas Pipeline

Assembly and welding works on sections with a total length of 6.6 km (gas pipeline to the city of Vladivostok); pipe diameter: 1020 mm; wall thickness: 10.3-12.3 mm.

2011–2012 Khabarovsk Territory
2011–2012

Construction of the Eastern Siberia-Pacific Ocean Oil Pipeline

Development of process maps and technical support of welding.

2013 Komi Republic
2013

Reconstruction of Interplant Pipelines at the KS-12 Mikun Compressor Station

Quality control of weld joints.

2013 Komi Republic
2013

Reconstruction of KS-12 Mikun Compressor Station

Quality control of weld joints.

2013 Komi Republic
2013

Reconstruction of the Ukhta – Yaroslavl Oil Pipeline

Quality control of weld joints.

2008–2014 Komi Republic
2008–2014

Construction of the Bovanenkovo – Ukhta Gas Pipeline

General contractor. Assembly and welding works on sections with a total length of 7,6 km; pipe diameter – 1420 mm; wall thickness – 27 mm .

2013–2014 Krasnodar Territory
2013–2014

Construction of Mountain Carousel Resort

onstruction and installation of ski slopes.

2013 Krasnodar Territory
2013

Construction of compressor station Kazachya (South Stream Trunk Pipeline - 191 km - D 1400 mm)

General contractor. Development of flow sheets, technical support, quality control of welded joints.

2014 Krasnoyarsk Territory
2014

Construction of Kuyumba – Taishet Oil Pipeline

General contract for construction of 174,3 km long two sections of trunk oil pipeline. Pipe diameter: 700 mm.

2000–2001 Leningrad Region
2000–2001

Construction of Baltic Oil Pipeline System

Development of process maps and technical support of welding.

2006–2010 Leningrad Region
2006–2010

Construction of the second line of the Gryazovets – Vyborg Gas Pipeline linking to North Stream

Development of process maps and technical support of welding.

2010–2011 Leningrad Region
2010–2011

Construction of North Stream Gas Transmission

Development of process maps and technical support for welding.

2012 Lipetsk Region
2012

Reconstruction of the Druzhba Oil Pipeline

Quality control of welded connections.

2012 Moscow Region
2012

Replacement of a defective section of the Ryazan-Moscow oil pipeline

Quality control of weld joints.

2013 Novgorod Region
2013

Gasification of Novgorod Region

Quality control of weld joints during the construction of gas pipelines.

2013 Republic of Adygea
2013

Reconstruction of the Maikop – Samurskaya – Sochi Oil Pipeline

Quality control of weld joints.

2012 Republic of Bashkortostan
2012

Construction of Bakhmut – Yangi-Auz – Gornyi klyuch – Yamansarovo-Yamangulovo Gas Pipeline

Quality control of weld joints.

2012 Republic of Bashkortostan
2012

Construction of gas pipeline and automated gas distribution station Mishkino – Novoklyuchevo – Malye Shady – Kalmazan – Bolshie Shady

Quality control of weld joints.

2013 Republic of Sakha (Yakutiya)
2013

Construction of the Chayanda – Lensk Gas Pipeline as part of the Yakutiya – Khabarovsk – Vladivostok Gas Pipeline (now part of the Power of Siberia Gas Pipeline Project)

Quality control of welded joints.

2000 Russian Federation - Turkey
2000

Construction of Blue Stream Gas Transmission Pipeline

Development of process maps and technical support of welding.

2011 Sakhalin Region
2011

Construction of the Beregovoi Commpresor Facility at the Kirinskoye Gas Condensate Field – Main Compressor Station of Sakhalin

Supply of CRC M-300 welding equipment, development of process maps and technical support of welding.

2011–2012 Sakhalin Region
2011–2012

Build out of the Kirinskoye Oilfield

Development of process maps and technical support of welding.

2011 Sakhalin Region
2011

Expansion of Sakhalin-I Arkutun-Dagi Oil Pipeline

Development of process maps and technical support of welding.

2004 Sakhalin Region
2004

Construction Sakhalin-I Oil Pipeline

Development of process maps and technical support of welding.

2003–2006 Sakhalin Region
2003–2006

Construction of the Sakhalin-II Oil and Gas Pipelines

Development of process maps and technical support of welding.

2012 Sverdlovsk Region
2012

Reconstruction of the Surgut – Polotsk Oil Pipeline (from pumping station Platina to pumping station Arbatskaya)

Quality control of weld joints.

2013 Tomsk Region
2013

Reconstruction and Refurbishment of Electrically Conductive Compressor Stations at the Nizhnevartovsk Gas Pipeline, the Gas Processing Plant– Parabel – Kuzbass Pipeline, Gazprom Transgaz Tomsk, Aleksandrovskaya Compressor Station

Quality control of weld joints.

1996–1999 Tver Region
1996–1999

Construction of the Yamal-Europe Gas Pipeline

Development of process maps and technical support of welding.

2013–2014 Tyumen Region
2013–2014

Construction of the Southern Balyk Gas Storage Station– Tobolsk-Neftekhim

Development of process maps and technical support of welding, quality control of weld joints.

2013 Volgograd Region
2013

Reconstruction of the KBSH – Lisichansk Oil Pipeline

Quality control of weld joints.

2012 Volgograd Region
2012

Construction of the Zhirnovsk – Volgograd Oil Pipeline

Quality control of weld joints.

2013–2014 Yamal-Nenets Autonomous Area
2013–2014

Major Overhaul of the second line of the Urengoi – Chelyabinsk Gas Pipeline

Quality control of weld joints.

2012 Yamal-Nenets Autonomous Area
2012

Construction of Medium Pressure Gas Reduction Station No. 2 – Boiler Station No. 1 of the City of Tarko-Sale

Quality control of weld joints.

2014 Yamal-Nenets Autonomous Area
2014

Construction of Zapolyarye – Purpe Oil Pipeline

Development of process maps and technical support of welding.